The Purchase Strategy of the Air Material Spare Parts Based on Its Delay Time Cost
DOI:
Author:
Affiliation:

northwestern polytechnical university

Clc Number:

V215.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the prospective of the cost-effective ratio, the relation between spare parts’ delay time and their costs is researched, and the purchase strategy and simulation methodology of spare parts are provided. Finally, take B1-B Bomber as an example, the results under different purchase strategies are computed by the simulation method. And the metrics and the feasible of the strategy are analyzed with figures and table.

    Reference
    Related
    Cited by
Get Citation

songwenjing. The Purchase Strategy of the Air Material Spare Parts Based on Its Delay Time Cost[J]. Advances in Aeronautical Science and Engineering,2015,6(1):

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 09,2014
  • Revised:January 08,2015
  • Adopted:January 09,2015
  • Online: June 22,2016
  • Published: