Abstract:In the prospective of the cost-effective ratio, the relation between spare parts’ delay time and their costs is researched, and the purchase strategy and simulation methodology of spare parts are provided. Finally, take B1-B Bomber as an example, the results under different purchase strategies are computed by the simulation method. And the metrics and the feasible of the strategy are analyzed with figures and table.